Warewash Installation at a South West London University

A dual hood pass-through dishwasher installation requiring a full electrical power supply redesign — delivered alongside bespoke stainless steel fabrication by Catercall's project team.

Case Study — Education & Higher Education

 

Project Overview

  • Client: University, South West London
  • Scope: Supply and installation of two Maidaid hood pass-through dishwashers, bespoke stainless steel tabling and sinks, full electrical power supply upgrade
  • Equipment: Maidaid hood pass-through dishwashers; stainless steel fabrication by Seropa Ltd
  • Project Sales / Manager: Luke Mangold, Catercall

 

The Challenge: Scaling Up Warewash Capacity with a Complex Power Requirement

The university required a significant upgrade to its warewash provision, moving from a single Minirack dishwasher to two Maidaid hood pass-through dishwashers — a substantial increase in both capacity and capability.

The existing electrical infrastructure presented the key challenge. The site had a single 3-phase 63-amp isolator serving the original Minirack machine. With two hood pass-through dishwashers now being installed, each requiring their own dedicated supply, the power infrastructure needed a full redesign before any equipment could go in.

 

The Solution: Electrical Redesign and Full Installation

Catercall's project team managed the full scope of works, including:

  • Full electrical rewire to provide two independent 3-phase 32-amp isolators — one per dishwasher
  • Supply and installation of two Maidaid hood pass-through dishwashers
  • Commission and testing of both units to ensure full operational readiness
  • Supply and installation of bespoke stainless steel tabling and sinks fabricated by Seropa Ltd

 

Key technical detail: The move from one 63-amp isolator to two 32-amp isolators was essential to safely power two independent hood pass-through machines — a detail that required careful planning and execution ahead of equipment installation.

 

The Result: A High-Capacity Warewash Set-Up, Ready for Service

With the electrical infrastructure correctly specified and installed, both dishwashers were commissioned successfully and integrated with the new bespoke stainless steel tabling and sink configuration. The university now has a reliable, high-capacity warewash operation built to handle the demands of a busy catering environment.

 

Supporting Universities and Education Catering

Catercall regularly works with schools, colleges, and universities across the UK on warewash installations, kitchen refits, and planned preventative maintenance. If your institution is planning a warewash upgrade or kitchen project, our team can manage the full scope — from design and equipment supply through to installation and commissioning.

Learn more about our warewash services or explore our work in educationGet in touch to discuss your project.

Planning a warewash upgrade? Contact Catercall today or call us on 0203 988 2108.

Get in Contact Now

Our team is here to support you with all your repair, maintenance, and installation needs.
Available Monday-Friday, 8:30 AM to 5:00 PM, with 24/7 emergency service.

Breakdown and Service Requests

0203 988 2108

24hr turnaround for Comprehensive customers

Call Emergency Line

General Enquiries

0800 542 0016

Monday-Friday, 8:30 AM - 5:00 PM

Contact Us

Request Quote

service@catercall.co.uk

Get a detailed quote for your kitchen equipment needs

Request Quote